15-Day Turnaround with AI-Powered Vendor Discovery for Complex Civil Works in 4 Bio CNG Plants

Overview
Our client is a leader in renewable energy solutions, offering turnkey solutions in biogas, Bio-CNG, ethanol, and green hydrogen. They had a strong track record in sustainable energy infrastructure. Now, they were expanding with four new CBG plants across Haryana.
They needed qualified civil vendors, especially for large tanks built using the slipform shuttering method.
The scope also covered internal roads, drainage systems, equipment, and pipe rack foundations, as well as RCC paving, buildings, precast boundary walls, and administrative blocks, spread across four locations.
Challenges
- Specialized Technical Requirements: The slipform shuttering technique demands specific expertise that few vendors possess, particularly for large-diameter tanks exceeding 10 meters.
- Remote Location Constraints: The plants were located in remote areas, requiring vendors willing and equipped to work in challenging locations with limited infrastructure support.
- Quality Assurance Standards: Water-retaining structures needed vendors experienced in hydro-testing protocols, including level verification, surface seepage monitoring, and dampness assessment.
- Multi-Site Coordination: Managing construction across four simultaneous locations required vendors with sufficient scale and project management capabilities.
Vendor Attributes
The ideal vendor needed to meet the following pre-qualification criteria (PQR):
- Proven experience in industrial civil construction, including factory buildings, equipment foundations, and RCC roads.
- Executed large-diameter RCC tanks (diameter > 10 meters), silos, cooling towers, or chimneys.
- Demonstrated use of slipform technology in previous civil structures.
- Prior execution of circular RCC tanks in ETP/STP/WTP or water distribution systems.
- Minimum turnover of ₹ 50 Cr in the last financial year.
Venwiz Solution
Venwiz deployed a structured approach to identify and onboard the right vendor:
- AI-Led Shortlisting: Our proprietary tools scanned internal and external databases to match vendor profiles with the client’s strict PQRs, narrowing the funnel to 5 qualified vendors.
- Technical Discussions: Facilitated detailed conversations with vendors on engineering standards, execution planning, and the critical role of slipform construction.
- Execution Planning: Collaborated with vendors to prepare site-specific schedules, ensuring optimized manpower deployment and resource allocation.
- Rate Optimization & Site Visits: Benchmarked project costs using internal tools and conducted joint site visits to resolve vendor queries and align on scope clarity.
- Techno-Commercial Closure: Organized joint evaluation sessions with the client and vendors to discuss technical capabilities, commercial terms, and execution roadmaps.
Impact

Conclusion
Complex renewable energy projects require specialized vendors who can navigate both technical challenges and remote site constraints. By leveraging AI-powered vendor discovery and structured evaluation processes, Venwiz enabled rapid identification of qualified partners, ensuring the CBG plant construction could proceed on schedule without compromising on quality or cost efficiency.
Are you expanding your brownfield or setting up a new greenfield project? From strict budgets to complex design standards, Venwiz has the expertise, network, and solutions to handle it all.
Schedule a call with us today and expect to hear from our experts within 24 hours!
Register or log in to our platform to meet all your capex procurement requirements.
To learn more, write to us at: contact@venwiz.com
Or visit our website today!
Related Blogs
Let’s talk about your next project
Our AI, expertise, and execution model close POs faster, cut slippages, and keep capital projects on schedule.





